Changes between Version 29 and Version 30 of WikiStart
- Timestamp:
- 2012-09-28T10:11:48Z (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WikiStart
v29 v30 10 10 * '''ropp_tools''' : low-level utility routines 11 11 * '''ropp_io''' : I/O support for RO data in netCDF and BUFR files 12 * '''ropp_pp''' : preprocessor to derive refractivity and bending angle profiles from excess phase and amplitude [https://trac. grassaf.org/ropp/wiki/ROPP_PP_tree.html calling tree]13 * '''ropp_fm''' : forward models (and associated tangent linear, adjoint & gradient code) [https://trac. grassaf.org/ropp/wiki/ROPP_FM_tree.html calling tree]14 * '''ropp_1dvar''' : 1D-Var retrieval & minimizer [https://trac. grassaf.org/ropp/wiki/ROPP_1DVAR_tree.html calling tree]12 * '''ropp_pp''' : preprocessor to derive refractivity and bending angle profiles from excess phase and amplitude [https://trac.romsaf.org/ropp/wiki/ROPP_PP_tree.html calling tree] 13 * '''ropp_fm''' : forward models (and associated tangent linear, adjoint & gradient code) [https://trac.romsaf.org/ropp/wiki/ROPP_FM_tree.html calling tree] 14 * '''ropp_1dvar''' : 1D-Var retrieval & minimizer [https://trac.romsaf.org/ropp/wiki/ROPP_1DVAR_tree.html calling tree] 15 15 16 16 Supporting modules for documentation, testing and building the source are: … … 24 24 == The ROPP Repository == 25 25 26 This ROPP Repository can only be accessed by authorized developers - [https://trac. grassaf.org/ropp/login login required].26 This ROPP Repository can only be accessed by authorized developers - [https://trac.romsaf.org/ropp/login login required]. 27 27 28 For instructions on how to access the ROPP repository (authorized users only) see the [https://trac. grassaf.org/ropp/wiki/ropp_repository instructions for developers].28 For instructions on how to access the ROPP repository (authorized users only) see the [https://trac.romsaf.org/ropp/wiki/ropp_repository instructions for developers]. 29 29 30 30 ---- … … 33 33 This body meets approximately once every two months to discuss forthcoming ROPP developments, to set priorities for implementation, and to provide a forum for general liaison between developers. Representatives from each ROM SAF Cooperating Entity are invited. 34 34 35 The formation of an ROPP Governance Group was one of the agreed conclusions from a discussion on the [https://trac. grassaf.org/ropp/browser/ropp_doc/trunk/Future_Ways_of_Working_with_ROPP.doc ways of developing ROPP in future].35 The formation of an ROPP Governance Group was one of the agreed conclusions from a discussion on the [https://trac.romsaf.org/ropp/browser/ropp_doc/trunk/Future_Ways_of_Working_with_ROPP.doc ways of developing ROPP in future]. 36 36 37 Here are the ROPP GG [https://trac. grassaf.org/ropp/browser/ropp_doc/trunk/ROPP_Devt_Group_ToR.doc terms of reference].37 Here are the ROPP GG [https://trac.romsaf.org/ropp/browser/ropp_doc/trunk/ROPP_Devt_Group_ToR.doc terms of reference]. 38 38 39 '''First meeting, 20 June 2012''' [https://trac. grassaf.org/ropp/browser/ropp_doc/trunk/ROPP_GG_200612_Agenda.doc Agenda] [https://trac.grassaf.org/ropp/browser/ropp_doc/trunk/ROPP_GG_200612_Minutes.doc Minutes]39 '''First meeting, 20 June 2012''' [https://trac.romsaf.org/ropp/browser/ropp_doc/trunk/ROPP_GG_200612_Agenda.doc Agenda] [https://trac.romsaf.org/ropp/browser/ropp_doc/trunk/ROPP_GG_200612_Minutes.doc Minutes] 40 40 41 '''Second meeting, 5 October 2012''' [https://trac. grassaf.org/ropp/browser/ropp_doc/trunk/ROPP_GG_051012_Agenda.doc Agenda]41 '''Second meeting, 5 October 2012''' [https://trac.romsaf.org/ropp/browser/ropp_doc/trunk/ROPP_GG_051012_Agenda.doc Agenda] 42 42 43 43 ----